Delay Analysis Principles
Primavera P6
Fundamentals of Contracts and FIDIC
Methods of Delay Analysis (AACE Practices)
Delay Analysis Methods in Project Management and Implementation in Primavera P6
EOT and Claims
International Contracts
International Standard Forms of Contract & EOT Provisions
Delay Claims & Compensation
This comprehensive course “Delay Analysis, EOT & Claims with Primavera P6 & International Contracts” is designed for engineers, planners, schedulers, and project management professionals who want to master the art and science of delay analysis, extension of time (EOT), and claim management using Primavera P6 and leading international contract standards such as FIDIC, JCT, NEC, AIA, Consensus Docs, ICE, and PPC2000.
You will learn the complete process of delay and claim management, from understanding scheduling fundamentals and contract obligations to performing professional forensic delay analysis and preparing EOT claims with real Primavera P6 examples.
The course begins with an introduction to project management and scheduling concepts such as Critical Path Method (CPM), baseline vs. updated schedules, and delay types, then moves into contractual principles under FIDIC and other standard forms, focusing on how EOT and delay clauses are applied in practice.
You will gain in-depth knowledge of delay analysis principles, including concurrent delays, float ownership, compensable delays, and AACE recommended analysis methods like Impacted As-Planned, Time Impact Analysis (TIA), As-Planned vs. As-Built, and Collapsed As-Built.
Through practical exercises and real case studies, you will learn how to prepare professional EOT and delay claims, demonstrate entitlement and causation, and calculate prolongation and disruption costs with supporting documentation.
The course also covers advanced topics such as risk analysis in delays, mitigation strategies, recovery schedules, and dispute resolution mechanisms like adjudication and arbitration.
By the end of this course, you will be able to confidently perform delay analysis using Primavera P6, interpret international EOT clauses, and prepare professional, contractually justified delay claims, essential skills for project planners, delay analysts, and contract professionals working on international projects.
Introduction to Standard Contracts & Why They Matter
FIDIC (International) – Red, Yellow, Silver Books & EOT Clauses
JCT (UK) – EOT Mechanisms & Case Example
NEC (UK & International) – Compensation Events & Early Warnings
AIA (USA) – Delay & EOT in Building Contracts
ConsensusDocs (USA) – Collaborative Claims Approach
ICE (UK) – Engineer’s Role in EOT
PPC2000 (UK) – Partnering & Collaborative Delay Management
Comparative Matrix: FIDIC vs JCT vs NEC vs AIA vs ConsensusDocs
Retrospective Time Impact Analysis (TIA) in Primavera P6
Prospective Time Impact Analysis (Window/Impact Analysis) in Primavera P6
Impacted As-Planned (IAP) Analysis in Primavera P6
Concurrent Delays Analysis in Primavera P6
As-Planned vs. As-Built Windows Analysis in Primavera P6
Collapsed As-Built / But-For Schedule Delay Analysis in Primavera P6
Recovery Schedule in Primavera P6
Revised Schedule in Project Management & Primavera P6
0 Reviews
Waheed Anwar
Primavera Instructor
As a certified trainer in Primavera P6 and Microsoft Project Professional, I bring over 16 years of hands-on experience in project management, backed by a Master's in Project Management, an MBA, and a Civil Engineering background. Since 2008, I’ve delivered over 400 corporate training sessions across sectors like Construction, Electrical, Mechanical, IT, and Manufacturing. My training is tailored, practical, and results-driven—focused on real-world application and designed to equip professionals with the tools and confidence to manage complex projects effectively. Your success and satisfaction remain my top priority.